The photo on the left shows you what the solar thermal area looked a few days after start up. The photo on the right shows you what the area looks like now, 3 weeks later.
The temperature differential controller that will control the pump based on the temperature difference from the collector and the storage tank temperature has been installed.
The second-priority heat exchanger, which is the copper tubing wrapped around the piping has been installed. The third-priority heat dump with radiant fins has been installed for the "dumping" of extra heat.
There is still more work to be done in the area including the installation of the expansion tanks.
The temperature differential controller that will control the pump based on the temperature difference from the collector and the storage tank temperature has been installed.
The second-priority heat exchanger, which is the copper tubing wrapped around the piping has been installed. The third-priority heat dump with radiant fins has been installed for the "dumping" of extra heat.
There is still more work to be done in the area including the installation of the expansion tanks.